Educational Background
Doctor Degree,Management Science & Engineering,Erasmus University Rotterdam, The Netherlands
Doctor Degree,Management Engineering,Tongji University, Shanghai, China
Bachelor Degree,Management Science and Engineering,Southeastern University, Nanjing, China
Academic Background
2010.06——2010.08,Visiting Scholar,Erasmus University, Netherlands
2010.01——2010.03,Visiting Scholar,Erasmus University, Netherlands
2009.07——2009.08,Visiting Scholar,Erasmus University, Netherlands
2008.01——2008.08,Visiting Scholar,Erasmus University, Netherlands/Bocconi University, Italy
2001.08——2001.12,Visiting Scholar,MIT Sloan School of Management, USA
Awards on Research
2018.10,The 14th Shanghai Award for Outstanding Achievements in Philosophy and Social Science,Second Prize,The Committee of Shanghai Award for Outstanding Achievements in Philosophy and Social Science
2015.12,The 7th National Award to Excellent Academic Achievement of High Education Institutes (Humanities and Social Science),Third Prize,Ministry of Education
Title of Honour
2001.06,The Century Star of Fudan University,Fudan University
Journal Papers
| 1. | Fangfang Wu, Run Zhang, and Xiandong Zhang. 2025. Scheduling moldable tasks on homogeneous multi-cluster platforms with GPUs. Computers & Operations Research 179 1-15. ![]() |
| 2. | Fangfang Wu, Zhongyi Jiang, Run Zhang, and Xiandong Zhang. 2023. Approximation algorithms for scheduling monotonic moldable tasks on multiple platforms. Journal of Scheduling 26 383–398. ![]() |
| 3. | Fangfang Wu, Xiandong Zhang, and Bo Chen. 2023. An improved approximation algorithm for scheduling monotonic moldable tasks. European Journal of Operational Research 306(2) 567-578. ![]() |
| 4. | Zhongyi Jiang, Fangfang Chen, and Xiandong Zhang. 2022. Single-machine scheduling problems with general truncated sum-of-actual-processing-time-based learning effect. Journal of Combinatorial Optimization 43 116–139. |
| 5. | Bo Chen and Xiandong Zhang. 2021. Scheduling coupled tasks with exact delays for minimum total job completion time. Journal of Scheduling 24 209-221. |
| 6. | Bo Chen and Xiandong Zhang. 2019. Scheduling with time-of-use costs. European Journal of Operational Research 274(3) 900-908. |
| 7. | Zhongyi Jiang, Fangfang Chen, and Xiandong Zhang. 2017. Single-machine scheduling with times-based and job-dependent learning effect. Journal of the Operational Research Society 68(7) 809–815. |
| 8. | Amir Hossein Gharehgozli, Yugang Yu, Xiandong Zhang, and René de Koster. 2017. Polynomial time algorithms to minimize total travel time in a two-depot automated storage/retrieval system. Transportation Science 51(1) 19-33. |
| 9. | Xiandong Zhang, Yeming (Yale) Gong, Shuyu Zhou, René de Koster, and Steef van de Velde. 2016. Increasing the revenue of self-storage warehouses by optimizing order scheduling. European Journal of Operational Research 252(1) 69–78. |
| 10. | Xiandong Zhang and Steef van de Velde. 2015. Two-machine interval shop scheduling with time lags. Journal of Scheduling 18(4) 359-368. |
| 11. | Shuyu Zhang, Xiandong Zhang, Bo Chen, and Steef van de Velde. 2014. Tactical fixed job scheduling with spread-time constraints. Computers & Operations Research 47 53-60. |
| 12. | Yiqian Huang, Yanming Ge, Xiandong Zhang, and Yifan Xu. 2013. Overbooking for parallel flights with transference. International Journal of Production Economics 144(2) 582-589. |
| 13. | Zheng, R., H. Li, X. Zhang. 2012. Scheduling an unbounded batching machine with family jobs and setup times. Journal of the Operational Research Society 63(2) 160-167. |
| 14. | Zhang, Xiandong and Steef van de Velde. 2012. Approximation algorithms for the parallel flow shop problem. European Journal of Operational Research 216(3) 544-552. |
| 15. | Yu, Yugang, George Q. Huang, Zhaofu Hong, and Xiandong Zhang. 2011. An integrated pricing and deteriorating model and a hybrid algorithm for a VMI (vendor-managed-inventory) supply chain. IEEE Transactions on Automation Science and Engineering 8(4) 673-682. |
| 16. | Zhang, Xiandong and Steef van de Velde. 2010. Polynomial-time Approximation Schemes for Scheduling Problems with Time Lags. Journal of Scheduling 13(5) 553-559. |
| 17. | Xiandong Zhang, Steef van de Velde. 2010. On-line Two-machine Open Shop Scheduling with Time Lags. European Journal of Operational Research 204(1) 14-19. |
| 18. | Xiandong Zhang, Steef van de Velde. 2010. On-line Two-machine Job Shop Scheduling with Time Lags. Information Processing Letters 110(12-13) 510-513. |
Conference Proceedings
| 1. | Xiandong Zhang, Jatinder N.D. Gupta. 2007. Two-machine Shop Floor Scheduling Problem with Multi-predecessor Constraints. Paris, France 538-545. |
| 2. | Guoping Jiang and Xiandong Zhang. 2005. Analysis of supply chain SD model: The impact of forecasting, price, and inventory. 25 Conference of System Dynamics and Management Science (11) . |
Academic Works
Xiandong Zhang. 2010. Scheduling with Time Lags. Erasmus University Rotterdam, Netherlands.
Research Projects
2020.01—2023.12, Principal Investigator, Discrete Convex Analysis for Scheduling Problems, National Natural Science Foundation of China
2014.01—2017.12, Principal Investigator, Studies on the Theory and Methods for Probabilistically Constrained Mixed-integer Programming Problems, National Natural Science Foundation of China
2012.01—2015.12, Principal Investigator, Scheduling Theory and Algorithms in Revenue Management, National Natural Science Foundation of China
2004.04—2004.07, Principal Investigator, Analytical Module Design for Sales Order Management System of Shanghai Volkswagen Co.Ltd, Shanghai Volkswagen Co.Ltd
2003.07—2004.02, Principal Investigator, Supply Chain Integration Strategy and Business Model Development for Shanghai Lansheng Corporation, Shanghai Lansheng Corporation
2000.09—2002.10, Principal Investigator, Simulation and Optimization Study on Logistics Distribution System, Shanghai Rising-Star Program for Young Scientists
1998.01—2000.12, Principal Investigator, Regional Disaster Economics: Theory and Policies, National Natural Science Foundation of China
Academic Posts
2025.05—,Menmber,Sorting Branch of ORSC
2021.12—,Member of the 10th Council,Scheduling Committee of Operation Research Society of China
2017.04—,Member of the 9th Council,Scheduling Committee of Operation Research Society of China
2013.10—,Member of the 8th Council,Scheduling Committee of Operation Research Society of China
2010.01—,Peer Reviewer,The Scientific Research Foundation for Returned Overseas Chinese Scholars of State Education Ministry
- firstpage <<previouspage nextpage>> endpage
- PageNumber 1/3
